Milestone plays a key role in the field of power station

2022/09/08

Baoding power plant is a plant who is key on thermal power generation and steam production. This plant supplies the electricity to the whole city of Baoding.

2.jpg 

As a result of ongoing use and wear, Production manager Mr.Wang decided that the existing boiler feed pumps need to be replaced with a new high specification and efficiency.

 

Following site visits, discussions with project manager Mr.Li and tending a proposal, Milestone were chosen to supply and install new pumps to feed boiler feed waters. The job would also see Milestone provide the pipe work, high voltage electric motor and control panels.

 

After around 45days production, all the boiler feed water pumps and components were supplied to site on time, while the control panels were produced by a brother company here in Hebei province.

1.jpg 

The 750KW and 600kw boiler feed water pump sets were then installed in the pumping station.

 

Milestones work was completed on time and without issue and the job as a whole was spread over several weeks as requested by Milestone to fit in with work schedule of the other contractors on site.

3.jpg 